INTERNATIONAL FABRICATION COMPANY

  PROJECTS  

CLIENTS


IFC delivers world-class project management services from simple to complex projects. We manage new standalone projects using state-of-the-art and leading edge project management principles and systems. Our proven track record provides for a seamless integration of project planning, execution, and monitoring into financial and subsequent maintenance tasks. IFC provides bespoke and turnkey project planning, mechanical and electrical installations, complete engineering design risk assessment and complete engineering project management to a variety of industries.


LIST OF CLIENTS
Private Sector Clients:
Government Sector Clients:
  • Nishat Group of Companies
  • Dewan Group of Companies
  • Engro Group of Companies
  • ICI Pak Limited
  • Sitara Group of Companies
  • Nestle Milk Pak Limited
  • Shell Pakistan Limited
  • Pak American Fertilizers
  • Pak Arab Fertilizers
  • Lucky Cement
  • Dandot Cement

  • Gharibwal Cement
  • Maple Leaf Cement
  • Dhan Fiber
  • Ibrahim Fiber
  • National Fiber
  • Rupali Polyester
  • Rafhan Maize Products
  • Sam Pak Paper Mills
  • Century Paper Mills
  • Kohat Cement Company
  • Army Welfare Trust (AWT)
  • Heavy Industries Taxila (HIT)
  • Heavy Mechanical Complex (HMC)
  • National Development Complex (DMC)
  • Oil & Gas Develop Corporation (OGDC)
  • Pakistan Atomic Energy Commission (PAEC)
  • Pakistan Railways (PR)
  • State Cement Corporation (SCC)
  • Sui Northern Gas Pipe Line (SNGPL)
  • Sui Southern Gas Pipe Line (SSGPL)
  • Water & Power Development Authority (WAPDA)

  PROJECTS  

CAPITAL/Mega Projects



Civil Works

Dandot Cement Company Limited

Civil Construction of Shed of pre Homognizing bed 150ft x 1000ft long

Location:Dandot
Completion Year:1983

Wapda (Gas Turbine Power Station)

Construction of civil foundation, retaining walls and flooring for 3Nos. 8000Cu.M oil storage tanks

Location:Kot Addu
Completion Year:1986

Wapda (Gas Turbine Power Station)

Construction of civil foundations,retaining walls and flooring for 02 Nos. 700 Cu.M Water Tank

Location:Kot Addu
Completion Year:1986

Wapda (Gas Turbine Power Station)

Construction of civil foundations for 02 Nos. 15000 Gallons over head storage Tanks

Location:Kot Addu
Completion Year:1986

Hazara Phosphate Fertilizers Ltd

Construction ofcivil foudnation for complete material handling system ncludin 14 nos belt conveyors and 04 nos bucket elevators

Location:Haripur
Completion Year:1988

Oil & Gas Development Company

Construction of civil foundation retaing walls etc. for 03 Nos. 3500 BBLS crude oil storage tanks.

Location:Mayal
Completion Year:1989

Wapda (Gas Turbine Power Station)

Construction of civil foundation, retaining walls and flooring for 4Nos. 8000Cu.M oil storage tanks

Location:Kot Addu
Completion Year:1990
Sui Northern Gas Pipe Lines Ltd

Complete Civil work required for laying to 6" ND 24Mile Long Joharabad KCP Under Ground Gas Pipe Line

Location:Joharabad
Completion Year:1994

Shell Pakistan Limited

Construciton of filling gantries, unloading gantries and RCC hardstanding

Location:Machike
Completion Year:1997

ICI Pakistan Limited

Laying & Commissioning of AC Pipeline (10") 15 KM Long from Jehlum River to ICI Khewra Site-15 along with all associated civil works

Location:Khewra
Completion Year:2005

Engro Chemical Pakistan Limited

Construction of Raw Material storage building (having capacity 20,000 M.Tons), Includind RCC Columns, beams, flooring, footinings and structural roofing

Location:Port Qasim Karachi
Completion Year:2005

Sweet water Pakistan Limited

Construction of Calf Barn,ii-Construction of commodity feed building, iii-RCC sand side walk,iv-Laying of 15" dia underground RCC pipe line

Location:Lahore
Completion Year:2006

Askari cement limited

Fabrication , installation and commissioning of cement transport system capacity(250 TPH) along with associated civil works/foundations

Location:Wah Cannt
Completion Year:2011


OIL and Gas
Cement Plants

Oil & Gas Development Corp.

Fabrication supply of 15 Nos. curde oil storage tanks size ,500 bbls each

Location:15 Nos.
Completion Year:1988

Sui Northern Gas Pipeline Ltd.

Erection of heavy vessels for dehydration plant Bank # 11

Location:Sui
Completion Year:1990

Sui Northern Gas Pipeline Ltd.

Laying of 6" ND 24 miles long Joharabad KCP Gas pipeline

Location:Joharabad
Completion Year:1994

OIL and Gas Development Corporation(OGDCL)

Replacement of 26" dia-15 KM,Long under ground sale gas pipe line

Location:UCH,Blochistan
Completion Year:2015

Fertilizer Plant

Pak Arab Fertilizers Co. Ltd.(Ammonia Plant)

Erection of mechanical equipment, tanks, cooling towers, fabrication and erection of process piping, insulation, testing and commissioning of ammonia plant
Pipe fabrication (Prepeation of spools for Ammonia Plant)
Process piping installation of Ammonia plant and offsites including structural steel works
Welding and Erection of Cone Roof Tank
Hot and Cold insulation of Ammonia process and storage plants as well as offsites
Equipment Erection and instalation of mechanical faciitieson cooling tower
Installation of offsite above ground piping
Laying of underground piping

Location:Multan
Completion Year:1978

Hazara Urea Fertilizer Ltd.(Urea Plant)

Fabrication and erection of welded steel, pressure vessels, pipes and pipe fittings

Location:Haripur
Completion Year:1980

Pak Arab Fertilizers Co. Ltd.

Fabrication and Installation of nitrophosphate expansion project alongwith electrical and instrumentation work on turnekey basis.

Location:Multan
Completion Year:1982

Pak Arab Fertilizer Co. Ltd.

Complete Mechanical Erection of 300 Ton per day Urea Plant, Nitric Acid storage tank, Chromate Removal Plant and Hydrogen Recovery Plant

Location:Multan
Completion Year:1986

Hazara Phosphate Fertilizer

Material supply, Design, Fabrication and Commissioning of 02 Nos. complete material handling systems and 02 Nos. sulphuric acid storage and circulation tank

Location:Haripur
Completion Year:1988

Pak American Fertilizers Ltd.

Fabrication & Erection of complete process and offsite piping and installation of Ammonia, Urea handling system and Urea packing of 1050 Tons/day Urea Plant

Location:Iskanderabad
Completion Year:1998

Pak American Fertilizers Ltd.

Complete Erection of Rotary and Static Equipments of 600 Tons/day Ammonia and 1050 Tons/day Urea Plant

Location:Iskanderabad
Completion Year:1998

Fatima fertilizer (Pvt) Limited

supply and fabrication of V-hangers for foundation structure of cooling towers

Location:sadiqabad
Completion Year:2008

Polyester Plant

ICI Polyester Plant.

Fabrication and erection of welded steel pressure vessels, tanks, and steel structure fabrication and erection of 3 ton capacity overhead travelling crane, fabrication and supply of SS road tanker for MAG transporatation. Fabrication and Erection of 4500 meters of associated pipe work

Location:Sheikhupura
Completion Year:1982

Rupali Polyester Ltd.

Fabrication and installation of air conditioning Equipment including grouting of the equipment. ,
Fabrication and installation of ducting including Fabrication and Installation of hangers and supports.
Installation of spinning M/c and drying system equipment which also included grouting of machines
Installation of Pre-fabricated steel structure
Fabrication and installation of steel structure

Location:Sheikhupura
Completion Year:1985

Dewan Salman Fibre Ltd. Phase 1

Fabrication of 200 Nos. Toe Canes, creel beams, MEG Road Tankers and Piping work

Location:Hattar
Completion Year:1991

Dewan Salman Fibre Ltd.

Fabrication and erection of two Nos. MEG Storage tanks capacity 4000 M3 and CS & SS piping work

Location:Port Qasim, Karachi
Completion Year:1991

Dewan Salman Fibre Ltd. phase 2

Installation and Commissioning of drawing, spinning,utilities and packing section equipments . Fabrication, Installation and Commissioning of piping works of drawing, spinning, utilities and packing sections .

Location:Hattar
Completion Year:1994

Dhan Fibres Ltd.

Installation and Commissioning of drawing, spinning,utilities and packing section equipments . Fabrication, Installation and Commissioning of piping works of drawing, spinning, utilities and packing sections .

Location:Hattar
Completion Year:1995

Dhan Fibres Ltd.

Complete Mechanical Erection of 18 MW (Furnace oil) Power Plant and process piping.

Location:Hattar
Completion Year:1996

Chemical plant

Exxon Cehmical Pakistan Ltd.

Fabrication and Erection of 02 Nos. waste heat recovery boilers capacity 50Ton/hour each. Fabrication and Erection of intlet and exhaust ducts for preheaters, superheaters etc. for heat recovery steam generation system

Location:Daharki (Sukkar)
Completion Year:1991

Engro Chemicals Pakistan Ltd.

Fabrication and Erection of CS and SS interconnecting piping, alongwith civil works

Location:Daharki (Sukkar)
Completion Year:1993

Sitara Chemical

Fabrication & installation of three stage falling film evaporator made of stainless steel along with heat exchanger for caustic soda concentration

Location:Faisalabad
Completion Year:1993

Engro Chemicals Pakistan Ltd.

Supply & manufacturing of Rubber lined rollers for belt conveyor dia 90mm (125 Nos. )

Location:Karachi
Completion Year:2002

Engro Asahi Polymer and Chemicals Limited

Design,Fabrication and Supply of Evicas Feed Tank

Location:Karachi
Completion Year:2004

Engro Chemicals Pakistan Ltd.

Fabrication and supply of Carbon Steel Buckets

Location:Karachi
Completion Year:2004

Engro Chemicals Pakistan Ltd.

Construction of 20 KT Raw Material Bulk Storage facility.

Location:Karachi
Completion Year:2004

Engro Chemicals Pakistan Ltd.

Design,Fabrication,Installation and Commissioning of 110 M.Ton per Hour capacity Raw Material Handling System

Location:Karachi
Completion Year:2005

LIST OF STORAGE TANKS FABRICATED

Oil & Gas Development Corp.

Fabrication supply of 15 Nos. curde oil storage tanks size ,500 bbls each

Completion Year:1988

Ravi Gas ( Pvt ) Ltd.

Fabrication, Hydrostatic testing & painting of LPG storage tank ( 04 Nos. ) cap. 60M.Tons each, Volume-110 M³ each

Completion Year:2002

Ravi Gas ( Pvt ) Ltd.

Fabrication, Hydrostatic testing & painting of LPG storage tank ( 04 Nos. ) cap. 60M.Tons each, Volume-110 M³ each

Completion Year:2002

Progas Pakistan Limited, Karachi

Design, Fabrication and supply of LPG STORAGE TANK Cap;30M.Tons, Volume- 55 M³

Completion Year:2003

Mohammadi Gas Compnay Limited

Design,Fabrication,Supply and Testing of 01 no. LPG Storage Tank capacity 62 M.Ton, Volume-

Completion Year:2004

WAPDA (Gas Turbine Power Station)

Construction of (Fabrication and erection including associated civil work,i-e ring wall foundations, dyke walls etc) of 3 Nos. Fixed Roof Fuel oil storage tanks cap. 8000 M³ Dia 100 Ft x Height 40 ft. at Kot Addhu

Completion Year:1985

WAPDA (Gas Turbine Power Station)

Construction of (fabrication erection including civil work) of 2 nos. Cap:700 M3 Water tank.

Completion Year:1985

WAPDA (Gas Turbine Power Station)

Construction of (Fabrication and erection including associated civil work,i-e ring wall foundations, dyke walls etc) of 4 Nos. Fixed Roof Fuel oil storage tanks cap. 8000 M³ Dia 100 Ft x Height 40 ft.

Completion Year:1988

Oil and Gas Development Company Limited

Fabrication and Installation of 03 nos. Fixed Roof Crude Oil Storage Tanks along with associated civil work,i-e ring wall foundations, dyke walls etc) (Capacity 6000 Bbls each) Dia 44 Ft x Height 27 Ft

Completion Year:2005

Liquid petroleum gas projects

Ravi Gas ( Pvt ) Ltd.

Fabrication, Hydro static testing & painting of LPG storage tank. ( 02 Nos. )Cap. 36 Ton

Faisalabad:Lahore
Completion Year:2000

Ravi Gas ( Pvt ) Ltd.

Fabrication, Hydrostatic testing & painting of LPG storage tank ( 06 Nos. ) cap. 60M.Tons each

Faisalabad:Lahore
Completion Year:2000

Rafhan Maize (Pvt) Ltd.

Supply, fabrication & erection of knock out drum & de-odourizer

Faisalabad:Faisalabad
Completion Year:1991

Cres LPG ( Pvt ) Limited

Fabrication, Hydrostatic testing & painting of 02 Nos. LPG Bowzer cap. 27 M.Tons

Faisalabad:Lahore
Completion Year:2004

Cres LPG ( Pvt ) Limited

Design,Fabrication, Hydrostatic testing & painting of LPG storage tanks ( 02 Nos. ) cap.137 M.Tons each

Faisalabad:Lahore
Completion Year:2004

Progas Pakistan Pvt. Ltd.

Welding,Installation,Testing and Commissioning of 02 nos. LPG Storage Spheres(capacity 1000 M.Tons each)

Faisalabad:Karachi
Completion Year:2004

Cres LPG ( Pvt ) Limited

Design,Fabrication, Hydrostatic testing & painting of LPG storage tanks ( 01 Nos. ) cap.27 M.Tons

Faisalabad:Lahore
Completion Year:2004

Links International

Design,Fabrication & Supply of 10 Nos. LPG Bowzers (Capacity: 24 M. Tons each)

Faisalabad:Lahore
Completion Year:2005

Mohammadi Gas Compnay Limited

Design,Fabrication,Supply and Testing of 01 no. LPG Storage Tank capacity 62 M.Ton

Faisalabad:Islamabad
Completion Year:2005

Koh Suleman Contractors

Design,Fabrication and Supply of 02 nos. LPG Bowzers capacity 24M.Tons each

Faisalabad:Muzaffar Garh
Completion Year:2005

Punjab Carriage Contractors

Design,Fabrication and Supply of 02 nos. LPG Bowzers capacity 24M.Tons each

Faisalabad:Muzaffar Garh
Completion Year:2005

Progas Pakistan (Pvt) Limited

Fabrication & Supply of 12 nos. LPG Bowzers (Capacity 24 M.Tons each)

Faisalabad:Karachi
Completion Year:2005

Iqra Gas (Pvt) Limited

Design,Fabrication and Supply of 02 nos. LPG Storage Tanks cap:60M.Tons

Faisalabad:Gujranwala
Completion Year:2005

Pioneer Gas (PVT) Limited

Design, Fabrication & Supply of 02 Nos. LPG Storage Tanks (Capacity: 50 M. Tons each)

Faisalabad:Lahore
Completion Year:2005

Cress LPG (Pvt) Limited

Fabrication & Supply of 05 nos. LPG Bowzers (Capacity 24 M. Tons each)

Faisalabad:Lahore
Completion Year:2005

Cres Gas Carriers

Fabrication & Supply of 05 nos. LPG Bowzers (Capacity 24 M. Tons each)

Faisalabad:Lahore
Completion Year:2005

CRukkin LPG (Pvt) Limited

Design, Fabrication and Supply of LPG storage tank cap:60 M.Tons

Faisalabad:Lahore
Completion Year:2007

Rukkan LPG (Pvt.)Limited

FDesign, fabrication and supply of 02 nos.LPG storage tanks capacity 60M.Tons each

Faisalabad:Mandi Bahauddin
Completion Year:2007

Eitehad energy Pvt Limited

Design, Fabrication, testing and commissioning of 02 nos.LPG storage tanks capacity 155M.Tons each

Faisalabad:Lahore
Completion Year:2010

Cres Gas Carriers

Capacity enhancement of 18 nos. LPG Bowzers of various sizes

Faisalabad:Lahore
Completion Year:2011

Cress Gas LPG (Pvt) Limited

Design,Fabrication, Hydrostatic testing & painting of 07 nos. LPG Bowzer cap. 14 M.Tons each

Faisalabad:Lahore
Completion Year:2012

Ravi Gas Pvt. Limited

Design, Fabrication, testing and commissioning of 01 nos.LPG storage tanks capacity 155 M.Tons

Faisalabad:Lahore
Completion Year:2014

Cress Gas LPG (Pvt) Limited

Design,Fabrication, Hydrostatic testing & painting of 10 nos. LPG Bowzer cap. 28 M.Tons each

Faisalabad:Lahore
Completion Year:2014

Ravi Gas Pvt. Limited

Design, Fabrication, testing and commissioning of 02 nos.LPG Bowzers capacity 32 M.Tons each

Faisalabad:Lahore
Completion Year:2014

SKYERLPG Pvt. Limited

Design, Supply,Fabrication, testing and commissioning of 02 nos.LPG Bowzers capacity 32 M.Tons each

Faisalabad:Lahore
Completion Year:2014
Gharibwal Cement Ltd.

Improvement of stock Hall, Fabrication and Erection of Drag chain conveyor

Location:Gharibwal,Distt. Jhelum
Completion Year:1981

Dandot Cement Company Ltd.

Complete Mechanical Erection of 1000 Tons per day dry process Dandot Cement plant including Erection of raw material Transportation system 5.5 km LBC and construction of concrete prehomogenizing bed of 150'x1000'.

Location:Dandot
Completion Year:1983

Mustehkam Cement Ltd.

Replacement of Kiln Shells

Location:Abbotabad
Completion Year:1985

D. G. Khan Cement Co. Ltd.

Complete mechanical Erection of 2000 tons per day dry process cement plant

Location:D. G. Khan
Completion Year:1986

Mustehkam Cement Ltd.

Replacement of Kiln Shells alongwith process piping.e

Location:Abbotabad
Completion Year:1986

Mustehkam Cement Ltd.

Replacement of Kiln Shells and raw mill shells

Location:Abbotabad
Completion Year:1989

Associated Cement Ltd.

Replacement of shell pieces of kiln No.5

Location:Wah Cantt.
Completion Year:1990

D. G. Khan Cement Co. Ltd.

Construction of furnace oil storage tanks 2x3500 M3

Location:D. G. Khan
Completion Year:1990

National Cement Industries Ltd.

Replacement of kiln shell, girth gear raw mill angular flange

Location:Dandot
Completion Year:1990

D. G. Khan Cement Co. Ltd.

Construction of furnace oil storage tanks 2x3500 M3

Location:D. G. Khan
Completion Year:1996

D. G. Khan Cement Co. Ltd.

Complete Mechanical Erection and Fabrication of Preheater Steel Structure (Expansion Project) C.F silo and kiln feed Cyclone preheater Kiln Coolax cooler Clinker transport Clinker storage Compressed air system Fuel oil system Clinker transport from storage Cement mill Cement transport Pack house Sundries Cranes Weigh bridge

Location:D. G. Khan
Completion Year:1998

D. G. Khan Cement Co. Ltd.

Fabrication and supply of 04 nos. Exhaust Gas Bellows

Location:D. G. Khan
Completion Year:2002

D. G. Khan Cement Co. Ltd.

Fabrication and supply of 04 nos. Exhaust Gas Bellows

Location:D. G. Khan
Completion Year:2003

D. G. Khan Cement Co. Ltd.

Dismentallimg of Coal Preheater structure and equipment. Fabrication and erection of Preheater Steel Structure and Equipment at D.G.Khan Cement Upgradation Project-Unit 1

Location:D. G. Khan
Completion Year:2004

Askari cement limited

Fabrication , installation and commissioning of cement transport system capacity(250 TPH) along with associated civil works/foundations

Location: Wah Cannt.
Completion Year:2011

Power plant

WAPDA (Gas Turbine Power Station)

Construction of (Fabrication and erection including associated civil work) of 3 Nos. Fuel oil storage tanks cap. 8000 M3 100 Dia x height 40 ft.

Location:Kot Addu
Completion Year:1986

WAPDA (Gas Turbine Power Station)

Construction of (fabrication erection including civil work) 2 nos. 700 M3 Water tank

Location:Kot Addu
Completion Year:1986

WAPDA (Gas Turbine Power Station)

Construction of (fabrication erection including civil work) of 15000 Gallon Cap. 35 Meter High overhead Storage tanks.

Location:Kot Addu
Completion Year:1986

WAPDA (Gas Turbine Power Station)

Construction of (fabrication erection including associated civil work) of 4 Nos. fuel oil storage tank cap. 8000 M3 Dia 100 ft. height 40 ft.

Location:Kot Addu
Completion Year:1990

SH Enterprises

Design, Fabrication ,installation and commissioning of waste Tyre pyrolysis plant capacity 10 Ton.

Location:Lahore
Completion Year:2013

Lalyani Pyrolysis oil

Design, Fabrication ,installation and commissioning of waste Tyre pyrolysis plant capacity 10 Ton.

Location:Lahore
Completion Year:2014

ITS waste to energy

Design, Fabrication ,installation and commissioning of waste Tyre pyrolysis plant capacity 10 Ton.

Location:Lahore
Completion Year:2012

Liaqat steel Pvt. Limited

Design, Fabrication ,installation and commissioning of waste Tyre pyrolysis plant capacity 10 Ton.

Location:Lahore
Completion Year:2012

ICI Pakistan Limited

Fabrication & Installation of Tubes for Waste Heat Recovery Boiler

Location:Khewra
Completion Year:2005

Sitara Energy Ltd.

Complete Erection and installation of equipment, fabrication and erection of piping of 48 MW ( Furnace oil) power plant

Location:Faisalabad
Completion Year:1995

Recycling plant

SH Enterprises .

Design, Fabrication ,installation and commissioning of waste Tyre pyrolysis plant capacity 10 Ton.

Location:Lahore
Completion Year:2013

Lalyani Pyrolysis oil

Design, Fabrication ,installation and commissioning of waste Tyre pyrolysis plant capacity 10 Ton.

Location:Lahore
Completion Year:2014

ITS waste to energy

Design, Fabrication ,installation and commissioning of waste Tyre pyrolysis plant capacity 10 Ton.

Location:Lahore
Completion Year:2012

Liaqat steel Pvt. Limited

Design, Fabrication ,installation and commissioning of waste Tyre pyrolysis plant capacity 10 Ton.

Location:Lahore
Completion Year:2012

Foundrry and Ironmaking

Foundry service centre(SMEDA)

Fabrication , installation and commissioning of overhead crane (capacity 5Tons) along with tri pot capacity 5 Tons

Location:Lahore
Completion Year:2012

Foundry service centre(SMEDA)

Fabrication and supply of foundry equipments, including mould boxes, formers , molten metal ladles, sand riddle, wheel barrows, weighing scale etc.

Location:Lahore
Completion Year:2012

Pakistan Railways

Manufacturing and supply of Friction ring (Disk brake)

Location:Lahore
Completion Year:2015

Maize Projects

Rafhan Maize (Pvt) Ltd.

Design, Supply, Fabrication, Installation, Testing & commissioning of Bucket Elevators ( 02 Nos. 96' high) & Belt Conveyors (215' high)

Faisalabad:Faisalabad
Completion Year:1991

Rafhan Maize (Pvt) Ltd.

Design, Supply, fabrication, installation & commissioning of feed conveyor ( 45' ), Silo discharge Conveyors 50', Dumping scale discharge conveyor 40' & Steeps filling conveyor 150'

Faisalabad:Faisalabad
Completion Year:1991

Rafhan Maize (Pvt) Ltd.

Supply, fabrication & erection of knock out drum & de-odourizer

Faisalabad:Faisalabad
Completion Year:1991

Rafhan Maize (Pvt) Ltd.

Supply, fabrication & erection of centrifugal Fan ( 02 Nos.), Bleacher & entrifugal fan

Faisalabad:Faisalabad
Completion Year:1991

Rafhan Maize (Pvt) Ltd.

Supply, fabrication & installation of screw conveyors, feed suction fan & gluten suction fan

Faisalabad:Faisalabad
Completion Year:1991

Rafhan Maize (Pvt) Ltd.

Supply, fabrication & installation of seed dryer fan

Faisalabad:Faisalabad
Completion Year:1991

Rafhan Maize (Pvt) Ltd.

Supply, fabrication & installation of Mingler Box & Mixer Box

Faisalabad:Faisalabad
Completion Year:1992

Rafhan Maize (Pvt) Ltd.

Supply, fabrication & erection of chrystalizer

Faisalabad:Faisalabad
Completion Year:1992

Rafhan Maize Products Ltd.

Supply & Fabrication of equipment

Faisalabad:Faisalabad
Completion Year:2003

Steel Structures

ICI Polyester Plant.

Fabrication and erection of welded steel pressure vessels, tanks, and steel structure fabrication and erection of 3 ton capacity overhead travelling crane, fabrication and supply of SS road tanker for MAG transporatation.

Faisalabad:Sheikhupura
Completion Year:1982

Dandot Cement Company Ltd.

Complete Mechanical Erection of 1000 Tons per day dry process Dandot Cement plant including Erection of raw material Transportation system 5.5 km LBC and construction of concrete prehomogenizing bed of 150'x1000'.

Faisalabad:Dandot
Completion Year:1983

Rupali Polyester Ltd.

Fabrication and installation of air conditioning Equipment including grouting of the equipment. ,
Fabrication and installation of ducting including Fabrication and Installation of hangers and supports.
Installation of spinning M/c and drying system equipment which also included grouting of machines
Installation of Pre-fabricated steel structure
Fabrication and installation of steel structure

Faisalabad:Sheikhupura
Completion Year:1985

Pak Cement Co. Ltd.

Complete Mechanical Erection of 600 tons per day wet process cement plant (total Erection is 3200 tons).

Faisalabad:Iskanderabad
Completion Year:1988

Shell Pakistan Ltd.

Construction of Filling Gantries, Unloading Gantries and RCC Hard Standing
Construction of pipe crossover plateforms at Machike
Construction of fire water pup and foam house at Machike
Construction of steel structure shed for electrical switches at Machike
Construction and installation of round stair case
Supply an Installation of sewer system for gantries
Construction of decanting gantries
Construction of filling gantries, unloading gantries and RCC hard standing
Supply , Fabrication, Painting and installation of folding steps
Installation of fire water sprinkling system for tanks

Faisalabad:Machike
Completion Year:1997

D. G. Khan Cement Co. Ltd.

Complete Mechanical Erection and Fabrication of Preheater Steel Structure (Expansion Project)
C.F silo and kiln feed
Cyclone preheater
Kiln
Coolax cooler
Clinker transport
Clinker storage
Compressed air system
Fuel oil system
Clinker transport from storage
Cement mill
Cement transport
Pack house
Sundries
Cranes
Weigh bridge

Faisalabad:D. G. Khan
Completion Year:1998

D. G. Khan Cement Co. Ltd.

Dismentallimg of Coal Preheater structure and equipment. Fabrication and erection of Preheater Steel Structure and Equipment at D.G.Khan Cement Upgradation Project-Unit 1

Faisalabad:D. G. Khan
Completion Year:2004

Engro Chemicals Pakistan Ltd.

Design,Fabrication,Installation and Commissioning of 110 M.Ton per Hour capacity Raw Material Handling System

Faisalabad:Karachi
Completion Year:2005

Lucky Cement Limited

Fabrication/Erection of Equipment/steel structure at Lucky Cement. Raw Mill and Bagging House areas.

Faisalabad:Lakki Marwat
Completion Year:2005

Kohat Cement Limited

Fabrication and erection of equipments and steel structures(Complete clinker manufacturing system, including fabrication and erection of 105 Mtrs. high Pre-Heater structure)of 6700 TPD cement plant

Faisalabad:Kohat
Completion Year:2008

Mustehkum cement Limited

Fabrication and installation of equipment, steel structure and material handling system. Dismantling of equipments, fabrication and erection of utility piping(raw mill, lime stone crusher, cement mill, bagging house, raw material storage shed areas)

Faisalabad:Taxila
Completion Year:2009

Askari cement limited

Fabrication , installation and commissioning of cement transport system capacity(250 TPH) along with associated civil works/foundations

Faisalabad: Wah Cannt.
Completion Year:2011

List of three top projects during last five years

Jeans Company Pvt Ltd

Construction of New jeans Garments factory having covered area of 215000 Ft²

Faisalabad:Lahore
Completion Year:2015

OIL and Gas Development Corporation(OGDCL)

Replacement of 26" dia-15 KM,Long under ground sale gas pipe line

Faisalabad:UCH,Blochistan
Completion Year:2015

Pakistan Railways

Manufacturing and supply of Friction ring (Disk brake)

Faisalabad:Lahore
Completion Year:2015